The loss of mud to the formation may additionally reduce the mud level during the wellbore, that will decreased the hydrostatic force in the outlet. In shale sections, this induced lesser wall support may perhaps cause sloughing of shales, which even further may result in pipe sticking. Put simply, https://vertechs.pixnet.net/blog/post/196933162