1

Advanced 400 kW Chiller Installation Secures £50K Yearly Energy Savings and 200 Metric Tonnes CO₂ Cut

News Discuss 
Installation Overview At a prominent confectionery site in York, Newsome has installed a cutting-edge 400 kW chiller, marking the timely execution of the project. Designed to advance ESG targets, the installation enhances cooling reliability while cutting overall power consumption and CO₂ discharge. https://bookmarkpressure.com/story20640799/advanced-400-kw-chiller-installation-secures-50k-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-saving

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story