1

Die 2-Minuten-Regel für berlin

News Discuss 
Rein 1993 the power grid connections in the Berlin-Brandenburg capital region were renewed. Hinein most of the inner districts of Berlin power lines are underground cables; only a 380 kV and a 110 kV line, which ansturm from Reuter substation to the urban Autobahn, use overhead lines. The Berlin 380-kV https://berlin42081.actoblog.com/30487488/5-wesentliche-elemente-für-krimidinner

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story